Recipe: Draft Advanced Gold Mine Plans
From PotBS Wiki
(Redirected from Draft Advanced Gold Mine Plans)
Avast, matey! This article be outdated. Handsomely check if this here article still be shipshape. If so, smartly edit the | version = to the current game build (1.19.57.0). |
| RECIPE | |
| Draft Advanced Gold Mine Plans | |
| Type: | Structure |
| Labor required: | 36 hour(s) |
| Requirements: | You must be conscious |
| Cost: | 12000 |
| Required items: | None |
| Produces items: | Deed: Advanced Mine (Gold): 1 |
| Used by structure: | Master Draughtsman's Office |
| Learned from: | Fragments of an Engineering Manual, 7 |
| Information based on version 1.16.59.0 | |
