Advanced Mine (Gold)
From PotBS Wiki
| Shiver me timbers, the article be a Stub, arr! Maybe ye can help expand this sorry sight |
Avast, matey! This article be outdated. Handsomely check if this here article still be shipshape. If so, smartly edit the | version = to the current game build (1.19.57.0). |
| STRUCTURE | |
| Advanced Mine (Gold) | |
| A waterwheel provides the motive power to haul ore carts out of this gold mine. | |
| Lot size: | 1 lot(s) |
| Labor Factor: | 0.4 |
| Effective Labor per Day per lot: | 60 Hours |
| Construction time: | 1 hour(s) |
| Produced by: | Draft Advanced Gold Mine Plans |
| Requirements: | Must be a Freetrader Must be level 30 Reputation with port owner at least Indifferent Port must have Gold Deposits Port must have River |
| Construction Cost: | 4000 |
| Construction Materials: | Blocks, Lignum Vitae: 2 Granite: 5 Ingot, Brass: 2 Ingot, Iron: 2 Logs, Common Wood: 15 Logs, Oak: 5 Logs, Teak: 4 |
| Upkeep Costs (for one week): | 1000 |
| Effective Cost Per Lot: | 1000 |
| Provides recipes: | Mine Gold |
| Uses recipes: | Advanced Gold Mining Mine Gold |
| Information based on version 1.16.59.0 | |
Reduces the labor required by recipes to 40% of the original.
