Advanced Mine (Copper)
From PotBS Wiki
| STRUCTURE | |
| Advanced Mine (Copper) | |
| A waterwheel provides the motive power to haul ore carts out of this copper mine | |
| Lot size: | 1 lot(s) |
| Labor Factor: | 0.4 |
| Effective Labor per Day per lot: | 60 Hours |
| Construction time: | 1 hour(s) |
| Produced by: | Draft Advanced Copper Mine Plans |
| Requirements: | Must be Freetrader Must be level 30 Reputation with port owner at least Indifferent Port must have Copper Deposits Port must have River |
| Construction Cost: | 4000 |
| Construction Materials: | Blocks, Lignum Vitae: 2 Granite: 5 |
| Upkeep Costs (for one week): | 200 |
| Effective Cost Per Lot: | 200 |
| Provides recipes: | Mine Copper |
| Uses recipes: | Mine Copper |
| Information based on version 1.16.59.0 | |
Freetrader only building, requiring level 30 but decreases the labor used in recipes by a factor of 0.4
This building requires a River and Copper Deposits. The only port with both of these is Guanica.